Facebook Twitter Pinterest

Project Gallery

G.A. Dominguez has been providing quality construction services throughout Southern California since 1986. While we are experienced in residential, commercial, industrial and institutional construction, our primary focus is serving public agencies, including school districts, water districts, port districts, municipalities, and federal agencies.

The following is a sample of our most recent projects:

relocatable classroom removal at winchester elementary school
hemet unified school district

Oak Meadows ES Project Phot

Relocation and renovation of 8 district-owned modular classroom buildings. Scope of work included building transportation, site work at destination site (grading, underground utilities, concrete flatwork, and fencing), as well as the renovation of the newly-set buildings (new fire alarm and data systems, painting, wallcovering, and flooring).


poly high school relocatable classrooms
riverside county office of education

Oak Meadows ES Project Phot

Relocation and renovation of 8 district-owned modular classroom buildings. Scope of work included building transportation, site work at destination site (grading, underground utilities, concrete flatwork, and fencing), as well as the renovation of the newly-set buildings (new fire alarm and data systems, painting, wallcovering, and flooring).


huntington christian school

Oak Meadows ES Project Phot

Relocation and renovation of 8 district-owned modular classroom buildings. Scope of work included building transportation, site work at destination site (grading, underground utilities, concrete flatwork, and fencing), as well as the renovation of the newly-set buildings (new fire alarm and data systems, painting, wallcovering, and flooring).


bloomington middle school ada access path
colton joint unified school district

Oak Meadows ES Project Phot

Relocation and renovation of 8 district-owned modular classroom buildings. Scope of work included building transportation, site work at destination site (grading, underground utilities, concrete flatwork, and fencing), as well as the renovation of the newly-set buildings (new fire alarm and data systems, painting, wallcovering, and flooring).


colton high school relocatable classrooms & restroom building
colton joint unified school district

Oak Meadows ES Project Phot

Relocation and renovation of 8 district-owned modular classroom buildings. Scope of work included building transportation, site work at destination site (grading, underground utilities, concrete flatwork, and fencing), as well as the renovation of the newly-set buildings (new fire alarm and data systems, painting, wallcovering, and flooring).


JAMES WORKMAN MIDDLE SCHOOL CLASSROOM INSTALLATION
PALM SPRINGS unified school district

Oak Meadows ES Project Phot

Relocation and renovation of 8 district-owned modular classroom buildings. Scope of work included building transportation, site work at destination site (grading, underground utilities, concrete flatwork, and fencing), as well as the renovation of the newly-set buildings (new fire alarm and data systems, painting, wallcovering, and flooring).


SWING SPACE SITE WORK
LONG BEACH COMMUNITY COLLEGE DISTRICT

Oak Meadows ES Project Phot

Infrastructure for 30 future modular classrooms. Scope of work included grading, paving, underground utilities (sewer, water, and electrical), new 12kVA electrical transformer, concrete flatwork, fencing, and parking lot striping.


Oak meadows elementary school classroom relocation
Menifee unified school district

Oak Meadows ES Project Phot

Relocation and renovation of 8 district-owned modular classroom buildings. Scope of work included building transportation, site work at destination site (grading, underground utilities, concrete flatwork, and fencing), as well as the renovation of the newly-set buildings (new fire alarm and data systems, painting, wallcovering, and flooring).


KIMBALL HOUSE RESTORATION & ada upgrades
city of national city

Oak Meadows ES Project Phot

ADA upgrades for city-owned historic house and public museum. Scope of work included the construction of a new ADA public restroom, installation of a wheelchair lift, concrete flatwork, and landscaping; restoration items included the repair and restoration of windows, interior renovations/repairs, and building shoring & foundation repairs.


SAN DIEGO CRUISE SHIP TERMINAL CUSTOMER RESTROOM
san diego unified port district

Oak Meadows ES Project Phot

G.A. Dominguez supplied and installed a new modular restroom building at the passenger waiting area inside the cruise ship terminal. Scope of work included site preparation; concrete cutting and patching to accommodate new utilities; sewer, plumbing & electrical connections; and custom metal ramps for restroom access.


OAK KNOLL VILLAS COMMUNITY CENTER
POWAY, CA

Oak Meadows ES Project Phot

Grading, below-grade concrete foundations, and related site work for the installation of a multi-building modular community center.


 

 

 

G.A. Dominguez General Engineering & Contracting - Providing quality construction services since 1986